News

Highlights

Infrastructures

Innovation to bring a 19th-century bridge into the 21st century

Sacyr Engineering and Infrastructure is developing a unique and innovative project in Chile: a 1.8-kilometer bridge in the Biobío Region that will replace the current one from 1889. We have created a "beam launcher" for more efficient installation of the 62 beams that make up the infrastructure.

18/01/2024

P3 Projects

Our Rota de Santa Maria P3 project in Brazil reaches the two-year mark

RSC-287 road in Rio Grande do Sul state is a strategic road in the region. Our management has greatly improved comfort and safety for users.

07/09/2023

Infrastructures

Major progress on the Ferrocarril Central de Uruguay!

First phase to verify the working state of tech, signalling and communications systems.

16/08/2023

People

“The thrill of riding a motorcycle at 125 mph is incomparable”

Juan Carlos Ruíz details his passion for motor sports and tells us about his new position at the Unión Vial Camino del Pacífico after years at AUNOR.

07/07/2023

P3 Projects

Two Ruta PY02 bypasses open to traffic

Mario Abdo Benítez, president of the Republic of Paraguay, attended the opening ceremony of the Rutas del Este’s Caacupé and Itacurubí bypasses.

17/07/2023

P3 Projects

We signed the Certificate of Commencement over the Canal del Dique Ecosystems P3

This public-private partnership, in the Caribbean region of Colombia, comprises a 435,000-hectare influence area and will impact the lives of 1.5 million people.

02/06/2023

P3 Projects

We brought into operationa a new Pamplona – Cucuta section (Colombia)

This project, that improves connections in Norte de Santander, is at over 87% progress.

24/05/2023

Infrastructures

Works on the Ferrocarril Central (Uruguay) reach nearly 95% progress

Our colleagues in the project keep reaching new milestones in the largest infrastructure project in Uruguay

18/05/2023

Infrastructures

We delivered our first project in Texas!

The United States is a home market for Sacyr, where it started activities in 2018, and that produces a backlog of nearly €2,000 million

12/05/2023

P3 Projects

We won two IJGlobal Awards!

Sacyr Concesiones has won two IJGlobal Americas Awards: one for Rumichaca-Pasto 4G Refinance, Colombia in the Refinance Transport - Latin America category, and another for the Ferrocarril Central Railway, Uruguay, in the Refinance Rail - Latin America category.

29/03/2023

P3 Projects

Buenaventura-Buga, an extraordinary road project in Colombia

We’ve signed the start of work contract of our fifth road project in Colombia. We’ll invest nearly €900 million to improve safety and comfort for users and reduce travel times

15/02/2023

Infrastructures

We inaugurate a large tunnel boring machine in the Sâo Paulo metro

We are expanding Line 2 of the Sâo Paulo metro with the construction of a station, a maintenance complex for rolling stock, five ventilation and emergency exits, and a double-track tunnel. A large tunneling machine is already on its way to Sao Paulo to assist us in this project.

06/02/2023

P3 Projects

We operate the Los Vilos - La Serena section on Ruta 5!

We take on a new challenge: the upgrade works on the Ruta del Elqui (Chile) road

19/12/2022

Grandview Kids, Award of Merit at the National Awards for Innovation and Excellence in P3

These awards recognize public-private partnerships that have demonstrated excellence and innovation

23/11/2022

P3 Projects

A desert in bloom on the most arid road in the world

This spectacular flower bloom takes place every seven years in the Chilean Atacama Desert. Our P3 Rutas del Desierto works to protect it and spread the word.

11/11/2022

P3 Projects

Social financing of Rumichaca-Pasto project in Colombia wins LatinFinance Award

  • The social financing for this P3 project reached US$ 800 million. It includes a US$ 262 million social bond, a € 278 million multi-trench bank loan, and another one in Colombian pesos equivalent to US$ 260.
  • LatinFinance recognized the P3 company’s innovative method to issue this social financing operation.

04/10/2022

P3 Projects

We are at almost 80% progress in the development of the Ferrocarril Central de Uruguay

We recently reached a milestone: the 100 km of railway track installed

04/08/2022

P3 Projects

AVO I highway goes into operation in Santiago (Chile)

  • This project, managed by Sacyr Concesiones and Aleática, is one of the most relevant infrastructures in Latin America
  • AVO I spans nine kilometers in Santiago, and was developed as a sustainable infrastructure that reduces pollution in the city

25/07/2022

Infrastructures

We expand in the US with a new road contract in Florida

Sacyr has 14 projects in the US and currently has a backlog of €1.2 billion. Achieving a greater presence in North America is one of the foundations in the 2021-2025 Strategic Plan.

21/07/2022

Infrastructures

The ‘Ferrocarril Central de Uruguay’ excedes the 75% progress mark

The ‘Ferrocarril Central de Uruguay’ will connect Urugay's inland with the port of Montevideo through a 271-kilometer layout

17/06/2022

— 20 Items per Page
Showing 1 - 20 of 58 results.

This website uses its own and third-party cookies to improve the user experience and analyze their behavior in order to improve the service offered.
You can consult additional information about the cookies installed on our Cookies policy.

Cookie Settings

Cookie declaration

TECHNICAL

These cookies are exempt from compliance with article 22.2 of the LSSI in accordance with the recommendations indicated by the European authority on privacy and cookies. In accordance with the above and although configuration, acceptance or denial is not possible, the editor of this website offers information about them in an exercise of transparency with the user.

  • Name: LFR_Session_STATE_*, Provider: Liferay, Purpose: Manages the session as a registered user , Expiration: Session, Type: HTTP

  • Name: GUEST_LANGUAGE_ID, Provider: Liferay, Purpose: Determines the language with which you access , to show the same in the next session, Expiration: 1 year, Type: HTTP

  • Name: ANONYMOUS_USER_ID, Provider: Liferay, Purpose: Manages the session as an unregistered user , Expiration: 1 year, Type: HTTP

  • Name: COOKIE_SUPPORT, Provider: Liferay, Purpose: Identifies that the use of cookies for the operation of the portal, Expiration: 1 year, Type: HTTP

  • Name: JSessionID, Provider: Liferay, Purpose: Manages login and indicates who is using the site, Expiry: Session, Type: HTTP

  • Name: SACYRGDPR, Supplier: Sacyr, Purpose: Used to manage the cookie policy , Expiration: Session, Type: HTTP